Project documents

Appendix I: Drawings

Engineering side views and tunnel cross sections from the project's NJDEP Green Acres application (Volume I, Appendix I).

Publisher
Hudson Tunnel Project (project website library)
Link
hudsontunnelproject.com/NJDEP_10 (PDF, 3.7 MB)
Date
Sheet P1C-GP-5100 is dated 12 February 2025
Licence
Public document; no licence stated
Used for
Tunnel depths, rock and soil, shafts, cross passages, treated ground, bulkheads, tube size and spacing: alignment.js, geology.js, works.js, contracts.js, labels.js
Appendix I-2: coloured side view of the tunnel from New Jersey to Manhattan
Page 3 · I-2, Tunnel cross section, Hudson River. Rock, soil, shafts, stabilized zone.
Appendix I-3: side view of the New Jersey segment with cover depths
Page 4 · I-3, New Jersey segment. Depth to tunnel at each street.
Appendix I-4: twin bored tubes side by side
Page 5 · I-4, Bored tunnel cross section. Tracks T4 and T1, 20–28 ft apart.
Appendix I-5: one tunnel ring with dimensions
Page 6 · I-5, Bored tunnel dimensions. 25 ft 2 in inside diameter.
Drawing P1C-GP-5100: key plan and profile
Page 7 · P1C-GP-5100, Key plan and profile. Cross passages, frozen ground.

Final EIS, Chapter 3: Construction Methods and Activities

The 2021 environmental review's chapter on how the project would be built, with route maps and the planned schedule.

Publisher
Federal Railroad Administration and NJ TRANSIT, Final Environmental Impact Statement
Link
hudsontunnelproject.com/FEIS Ch3 (PDF, 5.1 MB) · all chapters: FEIS page
Date
27 May 2021
Licence
US government document
Used for
The route frame, place labels and the Manhattan end: route.js stations, labels.js. The schedule pages are out of date and give only the order of work.
Figure 3-1: aerial overview of construction methods
Page 5 · Fig. 3-1, Overview of construction methods.
Figure 3-2a: construction in New Jersey, street map
Page 6 · Fig. 3-2a, New Jersey. Portal, shaft, bore.
Figure 3-2b: construction in New York, street map
Page 7 · Fig. 3-2b, New York. Bulkhead, 12th Ave shaft, casing.
Figure 3-16: construction schedule by activity
Page 69 · Fig. 3-16, Schedule by activity (2021; dates out of date).
Figure 3-17: construction schedule by staging site
Page 71 · Fig. 3-17, Schedule by staging site (2021; dates out of date).

Final EIS, Appendix 15: Geology and Soils

Reprints the 2009 ARC study's geology chapter: rock and soil maps, and an old cross section of the river valley. The route drawn on its maps is ARC's, not this project's.

Publisher
Federal Railroad Administration and NJ TRANSIT, Final Environmental Impact Statement (maps from USGS)
Link
hudsontunnelproject.com/FEIS Appendix 15 (PDF, 7.7 MB)
Date
27 May 2021 (text from 2009)
Licence
US government document
Used for
Rock and soil types, depth to rock at each bulkhead, the river valley's shape: geology.js
Figure 4.11-1: bedrock geology of New Jersey
Page 4 · Fig. 4.11-1, Bedrock geology, New Jersey.
Figure 4.11-2: surficial geology of New Jersey
Page 6 · Fig. 4.11-2, Surface deposits, New Jersey.
Figure 4.11-3: cross section of the Hudson valley along the old tunnels
Page 8 · Fig. 4.11-3, Hudson valley at the old tunnels (c. 1906).
Figure 4.11-4: bedrock geology of New York
Page 10 · Fig. 4.11-4, Bedrock geology, New York.

GDC talk to the NJ chapter of the American Concrete Institute

Slides from a Gateway Development Commission talk on the tunnel's construction: contract map, active sites, and side views with depths.

Publisher
Gateway Development Commission (GDC), posted by NJ ACI
Link
njaci.com, 2024.11.14_njaci_presentation.pdf (PDF, 3.7 MB) · meeting page
Date
14 November 2024
Licence
Public slides; no licence stated
Used for
Contract limits, portal, stabilized ground, depths under each street, cross passages: contracts.js, works.js, alignment.js, geology.js, the corner map
Slide 6: contract packaging map
Slide 6 · Contract packaging map.
Slide 10: Tonnelle Avenue site
Slide 10 · Tonnelle Avenue site and portal.
Slide 11: Hudson River ground stabilization
Slide 11 · River ground stabilization, about 1,200 ft.
Slide 14: Palisades tunnel side view with depths
Slide 14 · Palisades tunnel. Depths, 6 cross passages.
Slide 16: Hudson River tunnel side view
Slide 16 · Hudson River tunnel side view.

Penn Station Service Optimization Study, Phase I Report

The Federal Railroad Administration's study of how trains use Penn Station: the track plan, the station's levels, and which platforms each tunnel's trains can reach.

Publisher
Federal Railroad Administration (FRA)
Link
railroads.dot.gov, Penn Station SOS Phase I Report (PDF)
Date
13 July 2026
Licence
US government document
Used for
Penn Station below the street: the track level, Platforms 1 and 2, the Upper and Lower levels and the Moynihan concourse (station.js). Pages 7, 20 and 60.

GDC board meeting presentation

Slides from a Gateway Development Commission board meeting, with the Manhattan casing (HYCC-3) and the Palisades cross passages.

Publisher
Gateway Development Commission (GDC)
Link
gatewayprogram.org, GDC_Presentation_Board-Meeting_9.11.23.pdf (PDF, 1.8 MB) · board meetings page
Date
11 September 2023
Licence
Public slides; no licence stated
Used for
Tunnel and rock levels in Manhattan, the casing, cross passage positions: alignment.js, geology.js, works.js, contracts.js
Slide 9: Hudson Yards Concrete Casing section 3, plan and profile
Slide 9 · HYCC-3 plan and profile.
Slide 14: procurement advancements, Palisades tunnel aerial and profile
Slide 14 · Palisades cross passages, Manhattan tunnel.

Public data

OpenStreetMap

The free, volunteer-made world map. The two new tubes are mapped as proposed railways, traced by a mapper from the environmental review's drawings.

Publisher
OpenStreetMap contributors
Link
north tube, way 1181351406 (one of 14 ways)
Licence
ODbL, © OpenStreetMap contributors
Used for
The route and stations (route.js), shoreline, old tunnels and site outlines (basemap.js, water.js), street crossings (labels.js), roads, railways and stations on the large map (map-network.js)

NOAA digital elevation model (DEM_all mosaic)

Ground and riverbed heights, about 3 m cells.

Publisher
NOAA National Centers for Environmental Information
Link
DEM_all ImageServer
Licence
US government data, public domain
Used for
Ground line and riverbed every 50 ft (terrain.js), the large map's 3D ground (map-terrain.js)

Overture Maps buildings

Building footprints and heights, mostly from OpenStreetMap with some machine-drawn footprints from Microsoft. Release 2026-11-18.0.

Publisher
Overture Maps Foundation
Link
buildings guide · overturemaps.org
Licence
ODbL (attribution)
Used for
The 187 buildings in the side view (buildings.js) and the 11,398 on the large map (map-buildings.js)

Meta and WRI canopy height map

Tree canopy height worldwide on a grid of about 1 m, estimated by a machine-learning model from aerial imagery and trained on airborne lidar. The New York tile's imagery is from 2019 and 2020.

Publisher
Meta and the World Resources Institute (High Resolution Canopy Height Maps v2), published on Source Cooperative by Taylor Geospatial Engine Labs
Link
source.coop/tge-labs/meta-chm-v2 · papers: Tolan et al. 2024, Brandt et al. 2026
Licence
CC BY 4.0, © Meta / Data for Good
Used for
The trees in the side view: where each stands, how tall and how wide (trees.js)

New Jersey bedrock and surface geology

State geology maps at 1:100,000: Bedrock Geology (layer 14) and Surficial Geology (layer 25).

Publisher
NJ Geological and Water Survey (NJDEP)
Link
NJDEP Geology MapServer
Licence
Public NJDEP data
Used for
Ground colours on the large map (map-geology.js); a check on geology.js

New York bedrock geology

The USGS compilation of state geology maps, from the NYS Museum 1:250,000 bedrock map.

Publisher
USGS (hosted by NYSDOT)
Link
NYSDOT Geology FeatureServer, layer 1 · USGS state geologic maps
Licence
Public domain
Used for
Manhattan's rock on the large map (map-geology.js)

USGS elevation point query

The ground height at any point in the United States, from The National Map.

Publisher
USGS, The National Map
Link
Elevation Point Query Service
Licence
Public domain
Used for
A check on NOAA's ground heights

Reference sites

SkyscraperPage

A database of tall buildings with roof heights and drawings. The tower sprites are original, simplified drawings, made to these heights after looking at each tower's silhouette; nothing was traced or copied.

Publisher
SkyscraperPage.com
Link
skyscraperpage.com
Licence
Copyright SkyscraperPage; heights taken and silhouettes used as a reference, no drawings copied
Used for
Hudson Yards tower heights (10, 15, 30, 35, 50, 55 Hudson Yards and The Spiral): tower sprites and the height checks in tools/facts.js

SunCalc

The low-precision sun and moon formulas the sky uses (after Meeus, Astronomical Algorithms). The page works out where the sun and moon are from your computer's clock, good to about a degree. Written from memory; the page was not read on 21 Nov 2026.

Publisher
Vladimir Agafonkin
Link
github.com/mourner/suncalc
Licence
BSD-2-Clause; formulas only, no code copied
Used for
Day, sunset and night in the sky, with the sun, moon and its phase: src/daylight.js. Checked in tools/check.js against the solstices, a sunset and two eclipses.

News and press releases

Used for facts about the machines and the schedule: tbm.js and status.js.

19 Nov 2026
$16B Hudson Tunnel project launches second tunnel boring machine · Construction Dive, quoting a GDC release of 18 Nov. Machine positions (TBM 1 about 400 ft into the north tube, TBM 2 just launched in the south tube), rock reached 50–60 ft down at the Hudson County Shaft, river boring in 2028. Used by status.js, tbm.js, geology.js.
28 Sep 2026
Governor Hochul celebrates start of tunnel boring · NY Governor's office. Ceremonial start, about 30 ft a day, Palisades contractor.
28 Sep 2026
Tunnel boring for $16B Hudson River tunnel project begins · 6sqft. Start date, first and second machine.
29 Sep 2026
$16B Hudson Tunnel Project begins boring · Construction Dive.
20 Aug 2025
Hudson tunnel TBMs nearly assembled · Construction Briefing. Machine size, advance rate, launch shaft.
13 Oct 2026
Tunnel boring begins on Gateway Hudson Tunnel rail project · Equipment World. River contract award, April 2026.
9 Oct 2026
Hudson Tunnel Project begins drilling into Palisades Cliffs · NJBIZ. Boring under way about 8 October.
30 Sep 2026
Tunnel boring begins on Hudson Tunnel Project (and, 18 Feb 2025, on track to be completed by 2035) · Mass Transit. Service date.
 
gatewayprogram.org · Gateway Development Commission. Project pages and updates.

News articles are the publishers' copyright; the tracker takes facts from them, not text or pictures. The 2035 and 2038 dates come from news coverage.